Islamabad

islamic development

Mechanical and electrical services to new Islamic development consisting of multi-purpose hall Mosque, accommodation blocks and infrastructure

PROJECT WORK

PRE-DESIGNED : MECHANICAL & ELECTRICAL SERVICES

LOCATION

FARNHAM

PROJECT VALUE

£3m

£3m

TOTAL PROJECT VALUE

New mechanical and electrical services to pre-designed Islamic development made up of 6 buildings all with different M&E requirements.

.02

PHASES

To work in line with construction teams our work was split into two phases on this project.

11/18

November 2018

This project was successfully completed in November 2018.

Project Details

  • New mechanical and electrical services to pre-designed Islamic development made up of 6
    buildings all with different M&E requirements. This made co-ordination on the job a major consideration for the team.
  • Underground infrastructure carried out by TBS to link building services.
  • AHUs installed on hall roof to provide extract and ventilation for large mosque and hall area.
  • UFH installed throughout, linked back to BMS system with individual control panels in each building.
  • VRF split system AC installed in the mosque and hall with a requirement for all services to have the minimal visual impact in a place of worship.
  • Energy efficiency was a key motivation for the client so solar thermal panels were installed at ground level, along with solar PV on the roof with energy monitoring by the BMS system.
  • CP lighting control system used in hall and Mosque to allow for intricate lighting combinations and scene settings.