Forest Education Centre

education building

New build school in the New Forest.

PROJECT WORK

PRE-DESIGNED : MECHANICAL AND ELECTRICAL SERVICES

LOCATION

DIBDEN, NEW FOREST

PROJECT VALUE

£550k

£550k

PROJECT VALUE

Mechanical and Electrical services installed within a new build school.

08/15

AUGUST 2015

This project was completed in August 2015.

Project Details

This project consisted of:

  • Radian panel heating
  • Complete Flamefast gas proving system
  • Trend BMS system
  • Local room window controllers
  • Local carbon dioxide and temperature sensors installed
  • Hager switchgear
  • Complete LED lighting installation
  • Door access control, full CCTV system and complete intruder alarm system
  • Cat5 E structured cabling system

Particular detail was taken with the install necessary for exposed services.