Chertsey Street

prestigious office building

Office block refurbishment, prestigious offices within the centre of Guildford.

PROJECT WORK

DESIGN & BUILD : MECHANICAL AND ELECTRICAL SERVICES

LOCATION

GUILDFORD

PROJECT VALUE

£1.4m

£1.4m

PROJECT VALUE

Complete design of mechanical services, with design commenced 4 weeks prior to works required to commence on site due to previous contractor liquidation.

03/15

MARCH 2015

This project was completed in March 2015.

Project Details

  • Complete design of mechanical services, with design commenced 4 weeks prior to works required to commence on site due to previous contractor liquidation
  • Purpose, bespoke multi-service chilled beam installation to all floors integrating heating, cooling and lighting services to an existing building overcoming multiple structural obstacles. This required high-intensity management and resolution of engineering problems with the uniquely named manufacturer ‘Frenger’ on a high value manufacturing package, to achieve the timeline and engineering requirements of this project
  • Mechanical services inclusive of; chilled water pipework, LPHW heating pipework, domestic water services pipework, ventilation systems, drainage systems, air conditioning systems to every floor, which required high degree of co-ordination to fit with existing building structure
  • New Roof-top plantroom installation to existing building with selection of all plants critical to planning conditions for noise pollution
  • New basement plantroom installation, including new gas distribution throughout complete building
  • Each office area controlled separately within in each office space